|
GO BACK
This switch provides control for a
station when the "DC Brake Generator BitSwitch™"
is set for automatic:
This switch uses a unique control
scheme and is designed for a siding or station where one line divides at a station
or siding and then
merges to back to one line.
 |
The train entering the siding/station
will be stopped using CV4
and held until another train passes on the "Main Line".
|
 |
When a second train passes on
the "Main Line" it will not be stopped unless other traffic is
still ahead on the line.
|
 |
When the second train is clear of
the next forward block the first train will be released to the main line
using acceleration value CV3.
|
 |
If a third train enters the
controlled area on the "Main Line" before the train on the
passing/station siding departs the train on the siding will continue to be
held untill traffic allow re-entry to the "Main Line". |
In any case the trains in that
the station can be sent new commands for speed changes, lights, sound etc.. If a
BitSwitch has stopped an engine, the new command will not be activated
until the train is released.


GO BACK
|