This switch provides control for a station when the "DC Brake Generator BitSwitch™" is set for automatic:
This switch uses a unique control scheme and is designed for a siding or station where one line divides at a station or siding and then merges to back to one line.
|
The train entering the siding/station
will be stopped using CV4
and held until another train passes on the "Main Line". |
|
When a second train passes on
the "Main Line" it will not be stopped unless other traffic is
still ahead on the line. |
|
|
When the second train is clear of
the next forward block the first train will be released to the main line
using acceleration value CV3. |
|
If a third train enters the controlled area on the "Main Line" before the train on the passing/station siding departs the train on the siding will continue to be held untill traffic allow re-entry to the "Main Line". |
In any case the trains in that the station can be sent new commands for speed changes, lights, sound etc.. If a BitSwitch has stopped an engine, the new command will not be activated until the train is released.
